💼 Full-Time Position

Apprentice - CCQ - Des Neiges Sud Wind Farm Project

🏢
Borea Construction
📍 saint ferreol les neiges, qc, Canada
📍
Location
saint ferreol les neiges, Canada
📅
Posted
June 06, 2026
Type
Full-Time
🎯

Full-Time Opportunity: This is a permanent, full-time position with a competitive package and real career growth potential.

Job Description

Find the right energy here and come generate something big with us!

Des Neiges - Secteur Sud wind farm is located in the unorganized territory of Lac-Jacques-Cartier in the MRC of Côte-de-Beaupré, south of the existing wind farms. It will include 57 wind turbines of 7 MW each, for a total capacity of 400 MW.

As part of this project, Borea is seeking motivated apprentices for the trades listed below and is committed to facilitating their participation in a Red Seal designated trade program. Borea offers apprentices the opportunity to join a diverse site team and enables them to be involved in multiple aspects of wind farm construction.
• Heavy Equipment Operator Apprentice - CCQ
Start Date: March 2026
• Excavator Operator Apprentice - CCQ
Start Date: March 2026
• Crane Operator Apprentice - CCQ
Start Date: March 2026
• Heavy Equipment Mechanic Apprentice - CCQ
Start date: March 2026
• Line Worker Apprentice(2...